ATS Department Inspection Checklist

0% found this document useful (0 votes)
41 views3 pages
The document is a detailed inspection checklist for the ATS Department, covering various units including the Control Tower, Navigational Aids, and Briefing Unit. Each section lists specific items to be checked, ensuring operational readiness and compliance with safety standards. The checklist includes communication systems, radar functionality, environmental conditions, and briefing procedures.

Uploaded by

wael.k.itwee
License
© All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd

Detailed ATS Department Inspection Checklist

Control Tower Unit


No. Inspection Item Checked (✓)
1 Primary VHF communication tested ☐
2 Backup VHF frequency operational ☐
3 UHF system performance checked ☐
4 Clear transmission and reception ☐
verified
5 Internal intercom tested ☐
6 All radar consoles powered and ☐
working
7 Radar screen refresh rate acceptable ☐
8 Target tracking system functional ☐
9 System software version verified ☐
10 Recording system stores audio data ☐
correctly
11 Playback of recorded audio successful ☐
12 Time synchronization on systems ☐
verified
13 CCTV monitoring functional ☐
14 Lighting in control tower adequate ☐
15 Workstations ergonomically set up ☐
16 Valid ATC license ☐
17 Recent medical certificates ☐
18 Fire extinguisher in place and ☐
inspected
19 UPS switch-over successful ☐
20 Daily briefing system available to ☐
controllers

No. Inspection Item Checked (✓)


1 VOR signal stable and accurate ☐
2 DME range measurements within ☐
limits
3 NDB signal direction consistent ☐
4 NDB signal strength stable ☐
5 ILS Localizer aligned properly ☐
6 ILS Glide Slope operating correctly ☐
7 ILS Marker Beacons transmitting ☐
8 Antennas visually inspected ☐
9 Cables and connectors in good ☐
condition
10 Lightning protection system intact ☐
11 Remote monitoring connectivity ☐
functional
12 Environmental shelters clean and ☐
sealed
13 Cooling system operational ☐
14 Power supply stable and filtered ☐
15 Calibration records updated ☐
16 Interference levels tested and ☐
acceptable
17 Flight inspection last completed date ☐
noted
18 Antenna zones clear of obstructions ☐
19 Tower paint and marking visible ☐
20 Safety signage present ☐
Navigational Aids Unit

Briefing Unit

No. Inspection Item Checked (✓)


1 Flight plan system accessible ☐
2 Electronic FPL submission functional ☐
3 Manual FPL forms available ☐
4 NOTAM database current ☐
5 Weather data synchronized ☐
6 Access to meteorological charts ☐
7 Briefing room clean and organized ☐
8 Printers working and supplied ☐
9 Telephone line active ☐
10 Internet connection stable ☐
11 Email communication tested ☐
12 Backup PC or terminal available ☐
13 Uninterruptible Power supply and ☐
backup tested
14 Staff trained in briefing procedures ☐
15 Contingency plans accessible ☐
16 FPL transmission logs maintained ☐
17 FPL rejection/error handling tested ☐
18 NOTAM printing tested ☐
19 Maps and charts updated ☐
20 Wall clocks and timing devices ☐
synchronized

You might also like